Hi All, Currently we have 2 sets of drawers, the first set is used from 11am - 5pm then at staff change over an x read is done and the drawers are changed for the evening shift. I want to have the till do its own X read at 5pm instead of the staff having to manual do the read and nosey at the takings. I am correct in thinking i need to use the split reporting option in ICR?
Thanks